PVC圍擋的生產(chǎn)制作標(biāo)準(zhǔn)
來(lái)源:http://www.siemax-cx.com/ 發(fā)布時(shí)間:2023-10-30
測(cè)量放線:根據(jù)圍擋設(shè)計(jì)圖紙,對(duì)圍擋的尺寸和平面位置進(jìn)行測(cè)量放線,確定立柱和圍擋的具體位置。
Measurement and setting out: Based on the enclosure design drawings, measure and set out the dimensions and plane positions of the enclosure, and determine the specific positions of the columns and enclosures.
基礎(chǔ)開挖:根據(jù)測(cè)量放線的結(jié)果,開挖圍擋基礎(chǔ),基礎(chǔ)深度和大小應(yīng)根據(jù)圍擋的高度和重量進(jìn)行設(shè)計(jì)。
Foundation excavation: Based on the measurement and setting out results, the excavation of the enclosure foundation should be designed according to the height and weight of the enclosure.
立柱澆筑:在基礎(chǔ)開挖完成后,進(jìn)行立柱的澆筑。立柱應(yīng)采用預(yù)埋件和主體方籠組成,先將預(yù)埋件定位到基礎(chǔ)坑中澆筑,凝固后將圍擋方籠焊接或栓接到預(yù)埋鋼板上。
Column pouring: After the foundation excavation is completed, the column pouring is carried out. The column should be composed of embedded parts and the main square cage. The embedded parts should be positioned in the foundation pit and poured first. After solidification, the retaining square cage should be welded or bolted to the embedded steel plate.
板面組裝:在立柱澆筑完成后,開始進(jìn)行板面的組裝。板面由10塊雙層中空高強(qiáng)度PVC板組成,板高1900mm,厚度為22mm。板面龍骨焊接完成后,再進(jìn)行鍍鋅板面的卯裝。
Panel assembly: After the pouring of the column is completed, the assembly of the panel begins. The board surface is composed of 10 double-layer hollow high-strength PVC boards, with a height of 1900mm and a thickness of 22mm. After the welding of the keel on the board surface is completed, the galvanized board surface can be mortise assembled.
畫面噴繪:在板面組裝完成后,進(jìn)行畫面噴繪安裝。畫面可以采用廣告噴繪布或其他合適的材料,噴繪安裝完成后,整個(gè)PVC圍擋就制作完成了。
Screen painting: After the board assembly is completed, the screen painting installation is carried out. The screen can be made of advertising spray painting cloth or other suitable materials. After the spray painting installation is completed, the entire PVC enclosure is made.
需要注意的是,PVC圍擋的生產(chǎn)制作標(biāo)準(zhǔn)還應(yīng)符合相關(guān)的規(guī)定和要求。例如,圍擋的立柱應(yīng)采用鍍鋅鋼管進(jìn)行增強(qiáng),具有足夠的強(qiáng)度和抗沖擊性能;圍擋內(nèi)腔應(yīng)配有鍍鋅鋼管進(jìn)行增強(qiáng),具有足夠的強(qiáng)度和抗沖擊性能;圍擋的上下橫管也應(yīng)采用鍍鋅鋼管進(jìn)行增強(qiáng),以保證圍擋的整體強(qiáng)度和性。此外,制作標(biāo)準(zhǔn)還應(yīng)規(guī)定圍擋的規(guī)格尺寸、顏色、反光標(biāo)識(shí)等外觀要求,以保證圍擋的整體美觀度和性。
It should be noted that the production and production standards for PVC enclosures should also comply with relevant safety regulations and environmental requirements. For example, the columns of the enclosure should be reinforced with galvanized steel pipes, which have sufficient strength and impact resistance; The inner cavity of the enclosure should be reinforced with galvanized steel pipes, which have sufficient strength and impact resistance; The upper and lower horizontal pipes of the enclosure should also be reinforced with galvanized steel pipes to ensure the overall strength and safety of the enclosure. In addition, the production standard should also specify the appearance requirements of the enclosure, such as specifications, dimensions, colors, and reflective markings, to ensure the overall aesthetics and safety of the enclosure.
- 上一篇:基坑護(hù)欄的基本組成有哪些?
- 下一篇:鋼筋加工棚制作方法有哪些?